CNC Turned Parts
Delivery term:The date of payment from buyers deliver within days-
Price:
Negotiable
- minimum:
- Total supply:
-
Delivery term:
The date of payment from buyers deliver within days
-
seat:
Guangdong
-
Validity to:
Long-term effective
-
Last update:
2021-11-05 03:49
-
Browse the number:
109
+
- Contactaixin:
Contactaixin:
dgyj123(Mr.)
- Email: telephone: phone:
-
Area:
Guangdong
Address:Wuying Industrial Park, No.2 Hua'ertai Rd., Xinhe Community, Wanjiang District, Dongguan, Guangdong, China
-
Website:
http://www.yejia-machining.com/ http://dgyj123.mysuccessfulscents.com/
+
Product Specification
Part name: CNC Turned Parts
Working range: 1300X700mm
Accuracy: +/-0.01mm
Customize CNC Shaft parts of medical equipment. CNC turned parts manufacturer
Applicable industry: Medical& health, electron, photoelectric, aerial, aviation, semi-conductor, optics, transportation, military & defense etc.
Why Choose Us?
- Passed ISO9001:2015
- Four advantages:1) Improve quality with innovation;2)The concept of excellence;3)Introduction of advanced equipment;4) Good after-sale service.
Raw Material And Feature
Brass: C3600,C37700, Hpb59-1, C27200(CuZn37), etc
Good corrosion resistance:
The corrosion resistance of copper is lower than that of gold, platinum, silver and titanium, while gold, platinum, and silver are precious metals, but compared with metals such as iron, zinc, magnesium, copper is very resistant to corrosion Strong. Compared with aluminum, copper is more resistant to corrosion by non-oxidizing acids, alkalis, and seawater.
The strength of copper is moderate, easy to process and formability, also the color is simple, elegant and beautiful.
Machining Process And Treatment
CNC Turning, milling, grinding, drilling, tapping, wire EDM cutting , etc
Surface Treatment: Sand blasting, polishing, anodize, nickel/zinc/chrome plating, passivation, power coating, heat treatment, etc
QA Policy
The Quality Control Department is divided into three parts: IQC, IPQC and FQC, where IPQC is the core, because we believe that “Quality is manufactured but not tested.”
In the view of correction and prevention, we actively use advanced quality control techniques to analyze the causes, find out the critical problems, and completely eliminate the recurrence of problems.
Product Process
FAQ
How long for the lead time?
7-10 days when receive the deposit after order.
How to pay for the order?
- Western union or paypal for the samples.
- Bulk product: T/T, western union or L/C.
Package
Anti-rust oil→ Sydney paper→ Bubble pack inside→ Wooden /plastic box
Shipment
http://www.yejia-machining.com/